Gas power generation project

山西20×500

Create a project and build a monument

Case Introduction
  • Strengthen the safety management of explosive and non-explosive areas of gas power stations. (finish
  • 总体情况介绍:

    山西20

    Strengthen the safety management of explosive and non-explosive areas of gas power stations. (finished)

    The gas spray conveying pipe is not insulated near the generator room. (finished)

    Intake branch line arrester support did not reach the ground. (finished)

    There is more oil accumulation under the generator set, and effective measures should be taken to discharge it to the outside, and it is strictly prohibited to exist at the bottom of the unit or in the cable trench. (Cleaned up, take each shift to clean the oil at the bottom of the unit)

    The drainage and exhaust of the generator set shall be handled according to the regulations, resulting in outdoor. (Completed, the drain has been blocked by wire, and the discharge water is discharged by regular pipe)

    The surface of the pressure gauge of the branch water pipeline is much oily, and the unit has the phenomenon of oil leakage. (finished)

Jinan Jichai Huanneng Gas Power Generation Equipment Co., Ltd
  • 服务热线

    0531-62325028
    0531-69951266

山西20×500

Do a project, build a monument

Strengthen the safety management of explosive and non-explosive areas of gas power stations. (finish

山西20

Strengthen the safety management of explosive and non-explosive areas of gas power stations. (finished)

The gas spray conveying pipe is not insulated near the generator room. (finished)

Intake branch line arrester support did not reach the ground. (finished)

There is more oil accumulation under the generator set, and effective measures should be taken to discharge it to the outside, and it is strictly prohibited to exist at the bottom of the unit or in the cable trench. (Cleaned up, take each shift to clean the oil at the bottom of the unit)

The drainage and exhaust of the generator set shall be handled according to the regulations, resulting in outdoor. (Completed, the drain has been blocked by wire, and the discharge water is discharged by regular pipe)

The surface of the pressure gauge of the branch water pipeline is much oily, and the unit has the phenomenon of oil leakage. (finished)