欢迎进入济南济柴环能燃气发电设备有限公司官网!

常见问题解答

焦化发电机组安装前的准备工作

返回 2023.02.04 来源:http://www.huannengpower.com 0
焦化发电机组安装前的准备工作有哪些呢?我们可以从四个步骤来了解起来,接下来就让小编带领大家去看看吧。
What are the preparations for the installation of coking generator unit? We can learn from four steps. Next, let's take a look at it.
1、机组的搬运
1. Handling of unit
在搬运时应注意将起吊的绳索应系结在适当的位置,轻吊轻放。当机组运到目的地后,应尽量放在库房内,如果没有库房需要在露天存放时,则将邮箱垫高,防止雨水侵湿,箱子上应加盖防雨帐篷,以防日晒雨淋损坏设备。
During handling, pay attention to tie the lifting rope at the proper position and lift it gently. When the unit is transported to the destination, it should be placed in the warehouse as far as possible. If there is no warehouse to store it in the open air, the mailbox should be raised to prevent the rain from getting wet. The box should be covered with a rain-proof tent to prevent the equipment from being damaged by the sun and rain.
2、开箱
2. Unpacking
开箱前应首先清除灰尘,查看箱体有无破损。核实箱号和数量,开箱时切勿损坏机箱。开箱顺序是先拆顶板、再拆侧板。
Before unpacking, dust shall be removed first to check whether the box is damaged. Verify the box number and quantity, and do not damage the case when unpacking. The unpacking sequence is to remove the top plate first and then the side plate.
拆箱后需要做以下的工作:
The following work needs to be done after unpacking:
(1)根据清单清点全部机组及附件;
(1) Count all units and accessories according to the list;
(2)查看机组及附件的主要尺寸是否与图纸相符;
(2) Check whether the main dimensions of the unit and accessories are consistent with the drawings;
焦化发电机组
(3)检查机组及附件有无损坏和锈蚀;
(3) Check the unit and accessories for damage and corrosion;
(4)如果机组经检查后不能及时安转,应将拆卸过的机件精加工面上重新涂上防锈油。进行妥善保管;
(4) If the unit cannot be installed in time after inspection, the finished surface of the disassembled parts shall be coated with anti-rust oil again. Keep it properly;
(5)开箱后的机组要注意保管,须水平放置,各种接口须封盖、包扎、防止雨水和灰沙侵入。
(5) The unpacked unit shall be carefully kept and placed horizontally. All interfaces shall be sealed and bound to prevent rain and sand intrusion.
3、划线定位
3. Scoring positioning
4、检查设备准备安装
4. Check that the equipment is ready for installation
焦化发电机组安装前的准备工作相关内容就讲解完毕了,更多事项就来我们网站http://www.huannengpower.com进行咨询吧!
The relevant contents of the preparation work before the installation of the coking generator unit have been explained, and more matters will come to our website http://www.huannengpower.com Consult!
新闻搜索
济南济柴环能燃气发电设备有限公司
  • 服务热线

    0531-62325028
    0531-69951266

焦化发电机组安装前的准备工作

焦化发电机组安装前的准备工作有哪些呢?我们可以从四个步骤来了解起来,接下来就让小编带领大家去看看吧。
What are the preparations for the installation of coking generator unit? We can learn from four steps. Next, let's take a look at it.
1、机组的搬运
1. Handling of unit
在搬运时应注意将起吊的绳索应系结在适当的位置,轻吊轻放。当机组运到目的地后,应尽量放在库房内,如果没有库房需要在露天存放时,则将邮箱垫高,防止雨水侵湿,箱子上应加盖防雨帐篷,以防日晒雨淋损坏设备。
During handling, pay attention to tie the lifting rope at the proper position and lift it gently. When the unit is transported to the destination, it should be placed in the warehouse as far as possible. If there is no warehouse to store it in the open air, the mailbox should be raised to prevent the rain from getting wet. The box should be covered with a rain-proof tent to prevent the equipment from being damaged by the sun and rain.
2、开箱
2. Unpacking
开箱前应首先清除灰尘,查看箱体有无破损。核实箱号和数量,开箱时切勿损坏机箱。开箱顺序是先拆顶板、再拆侧板。
Before unpacking, dust shall be removed first to check whether the box is damaged. Verify the box number and quantity, and do not damage the case when unpacking. The unpacking sequence is to remove the top plate first and then the side plate.
拆箱后需要做以下的工作:
The following work needs to be done after unpacking:
(1)根据清单清点全部机组及附件;
(1) Count all units and accessories according to the list;
(2)查看机组及附件的主要尺寸是否与图纸相符;
(2) Check whether the main dimensions of the unit and accessories are consistent with the drawings;
焦化发电机组
(3)检查机组及附件有无损坏和锈蚀;
(3) Check the unit and accessories for damage and corrosion;
(4)如果机组经检查后不能及时安转,应将拆卸过的机件精加工面上重新涂上防锈油。进行妥善保管;
(4) If the unit cannot be installed in time after inspection, the finished surface of the disassembled parts shall be coated with anti-rust oil again. Keep it properly;
(5)开箱后的机组要注意保管,须水平放置,各种接口须封盖、包扎、防止雨水和灰沙侵入。
(5) The unpacked unit shall be carefully kept and placed horizontally. All interfaces shall be sealed and bound to prevent rain and sand intrusion.
3、划线定位
3. Scoring positioning
4、检查设备准备安装
4. Check that the equipment is ready for installation
焦化发电机组安装前的准备工作相关内容就讲解完毕了,更多事项就来我们网站http://www.huannengpower.com进行咨询吧!
The relevant contents of the preparation work before the installation of the coking generator unit have been explained, and more matters will come to our website http://www.huannengpower.com Consult!